Showing posts with label Manual. Show all posts
Showing posts with label Manual. Show all posts

Friday, June 5, 2009

Transfer helium from (100 Liter) Dewa...

Transfer helium from (100 Liter) Dewar to bolometer

In order to transfer helium smoothly, we need to position the bolometer at a good altitude, which depends on the dimensions of the Dewars and the trasfer line. Here is an illustration of how to determine how high the bottom of the bolometer should be.


Tuesday, April 21, 2009

Polishing sample

Polishing sample

We have successfully polished a sample down to 45 micron thickness using template method. Following is a summary.

As shown in the figure, the idea is to create a template using much harder materials (such as glass, rasor blade) than the sample. One advantage of this way is that you can measure the sample thickness using a micrometer (basically sample+glass -glass). Everything is glued using paraffin, which is safe and surprisingly strong for polishing and easy for removing.

The steps are:

1) we can start with as thick as 500 micron

2) polish the template down to 75 micron (150 grit, 400 grit)

3) put on sample, using 800 grit to polish easily down to the same thickness of the template

4) continue polishing with 800 grit until thickness is less than 50 micron

5) continue with 1500 grit, at this time one of the templates may be gone, which is ok.

6) polish until the satisfactory thickness, the lower limit may be 30 micron.

Thursday, June 26, 2008

Useful thermoconductivities



Material

Temperature

Thermoconductivity (W/mK)

Working temperature (K)

Apiezon N

293

0.194

4 - 300

4

0.095

Varnish

300

0.44

423

100

0.24

77

0.22

4.2

0.062

1

0.034

Crycon grease

4.2

0.1

2

0.03

Copper

300

400

Silver

300

429

Gold

300

318

Stainless steel

300

11-- 45

air

300

0.025


Wednesday, June 25, 2008

evaporation

423Kcryoncongrease

Tuesday, June 10, 2008

Operation of Bruker 113V

Turn on

Bolometer

Change diamond filter to position 2 before pumping

Connect pump station to the bolometer

Pump overnight using roughing pump according to instruction

Switch to turbo to get better vacuum

Precool bolometer using liquid nitrogen (fill twice to make sure it is full in both chamber) (see manual)

Precool for 15 minutes

Close the valve that connects the pumping station to the bolometer

Shutdown the pumping station according to the instruction and move it away

Blow out the liquid nitrogen from the Helium reservoir using He gas

Transport liquid He to the reservoir

Turn the diamond filter to position 1 for measurement

Turn the 3 switches on the preamplifier on


Spectrometer

Open the nitrogen gas valve (main, scanner and vent) on the wall

Close the valve that connects spectrometer to the pump

Vent the system (by ordering vent optics from the control panel)

Fire the Hg lamp

Turn on the scanner

Put in the sample assembly

Do a few test runs on the mirror and the sample to check if the level is consistent with previous runs

Evacuate the system by ordering so from the control panel

Close the vent valve

Open the valve that connects the spectrometer to the pump slowly

Do a few test runs to check if the system is stabilized to run the real experiement


Masurement…

Shut down

Turn off the three switches of the bolometer


Open the vent valve

Close the valve that connects spectrometer to the pump

Vent the system


Take the sample assembly out and put back the original lid

Close nitrogen gas valves (main, scanner and vent) on the wall

Evacuate the system by ordering so from the control panel

Open the valve that connects the spectrometer to the pump slowly


Monday, June 2, 2008

Magnet Lab manual is now posted to the Xpy.Daov space.
The link is:
http://xpydaov.spaces.live.com/