In order to transfer helium smoothly, we need to position the bolometer at a good altitude, which depends on the dimensions of the Dewars and the trasfer line. Here is an illustration of how to determine how high the bottom of the bolometer should be.
Friday, June 5, 2009
Transfer helium from (100 Liter) Dewa...
In order to transfer helium smoothly, we need to position the bolometer at a good altitude, which depends on the dimensions of the Dewars and the trasfer line. Here is an illustration of how to determine how high the bottom of the bolometer should be.
Tuesday, April 21, 2009
Polishing sample
We have successfully polished a sample down to 45 micron thickness using template method. Following is a summary.
As shown in the figure, the idea is to create a template using much harder materials (such as glass, rasor blade) than the sample. One advantage of this way is that you can measure the sample thickness using a micrometer (basically sample+glass -glass). Everything is glued using paraffin, which is safe and surprisingly strong for polishing and easy for removing.
The steps are:
1) we can start with as thick as 500 micron
2) polish the template down to 75 micron (150 grit, 400 grit)
3) put on sample, using 800 grit to polish easily down to the same thickness of the template
4) continue polishing with 800 grit until thickness is less than 50 micron
5) continue with 1500 grit, at this time one of the templates may be gone, which is ok.
6) polish until the satisfactory thickness, the lower limit may be 30 micron.
Thursday, June 26, 2008
Useful thermoconductivities
| Material | Temperature | Thermoconductivity (W/mK) | Working temperature (K) |
| Apiezon N | 293 | 0.194 | 4 - 300 |
|
| 4 | 0.095 |
|
| Varnish | 300 | 0.44 | 423 |
|
| 100 | 0.24 |
|
|
| 77 | 0.22 |
|
|
| 4.2 | 0.062 |
|
|
| 1 | 0.034 |
|
| Crycon grease | 4.2 | 0.1 |
|
|
| 2 | 0.03 |
|
| Copper | 300 | 400 |
|
| Silver | 300 | 429 |
|
| Gold | 300 | 318 |
|
| Stainless steel | 300 | 11-- 45 |
|
| air | 300 | 0.025 |
|
Wednesday, June 25, 2008
Tuesday, June 10, 2008
Operation of Bruker 113V
Turn on
Bolometer
Change diamond filter to position 2 before pumping
Connect pump station to the bolometer
Pump overnight using roughing pump according to instruction
Switch to turbo to get better vacuum
Precool bolometer using liquid nitrogen (fill twice to make sure it is full in both chamber) (see manual)
Precool for 15 minutes
Close the valve that connects the pumping station to the bolometer
Shutdown the pumping station according to the instruction and move it away
Blow out the liquid nitrogen from the Helium reservoir using He gas
Transport liquid He to the reservoir
Turn the diamond filter to position 1 for measurement
Turn the 3 switches on the preamplifier on
Spectrometer
Open the nitrogen gas valve (main, scanner and vent) on the wall
Close the valve that connects spectrometer to the pump
Vent the system (by ordering vent optics from the control panel)
Fire the Hg lamp
Turn on the scanner
Put in the sample assembly
Do a few test runs on the mirror and the sample to check if the level is consistent with previous runs
Evacuate the system by ordering so from the control panel
Close the vent valve
Open the valve that connects the spectrometer to the pump slowly
Do a few test runs to check if the system is stabilized to run the real experiement
Masurement…
Shut down
Turn off the three switches of the bolometer
Open the vent valve
Close the valve that connects spectrometer to the pump
Vent the system
Take the sample assembly out and put back the original lid
Close nitrogen gas valves (main, scanner and vent) on the wall
Evacuate the system by ordering so from the control panel
Open the valve that connects the spectrometer to the pump slowly